Top 3 Mistakes People Make with Grounding & Earthing Projects
Projects where the physical location of the buried grounding system is not even considered when thinking about the future above grade connections that will eventually be needed. Projects where columns and footings that could have been utilized for lightning protection down conductors and grounding electrodes for a few dollars in materials, end up costing the client thousands later just to have ugly external LPS installations with less overall benefit to the client. Projects with extensive steel rebar networks installed in concrete just inches below the floor of robotic factories not being utilized as a low-cost and highly-effective equipotential grid for fractions of the cost of installing an equipotential grid above-grade later.
Projects where the physical location of the buried grounding system is not even considered when thinking about the future above grade connections that will eventually be needed. Projects where columns and footings that could have been utilized for lightning protection down conductors and grounding electrodes for a few dollars in materials, end up costing the client thousands later just to have ugly external LPS installations with less overall benefit to the client. Projects with extensive steel rebar networks installed in concrete just inches below the floor of robotic factories not being utilized as a low-cost and highly-effective equipotential grid for fractions of the cost of installing an equipotential grid above-grade later. Projects with sensitive electronic systems that could have benefited not only from a dedicated electrode system, but from an isolation transformer, all of which could have easily been cost-effectively installed during original design/construction, but now costs tens of thousands of dollars later. Project where the grounding system must meet an engineering specification such as resistance-to-ground, but the A&E firm did not do their calculations and instead placed the burden on the electrical installer to test and amend the grounding system to meet the specification, resulting in cost overruns, delays, and unnecessary compromises in the sites primary electrical safety infrastructure system: grounding.
1. 250.24(B) 2. 250.28
1. NEC Articles 250.6(B) 2. 250.24(A)(5) HB Notes 3. 250.30 HB Notes “Application Examples 1, 2 and 3” 4. 250.30(A) 5. 250.30(A) HB Notes “Common Misconception” 6. 250.30(A)(1) 7. 250.30(A)(1) Exception #2 8. 250.30(A)(1) Exception #3 (a) and (b) 9. 250.30(A)(5) HB notes 10. 250.32(B)(2)(b) 11. 250.32(B)(1) HB notes 12. 250.142(B) 13. HB Exhibit 250.8
Related Articles

What to Look for When Choosing an Electrical Grounding Company
In the construction industry, selecting the right electrical grounding company is crucial for ensuring safety and project success. This blog post delves into the key factors you should consider to make an informed decision.
Read article
The Future of Electrical Grounding: Double Ring Electrode Systems
Inner Foundation Ring: Embedded within the concrete foundation, this ring bonds directly to the structural steel rebar, creating a unified grounding system throughout the building's foundation. Outer Buried Ring: Installed in direct contact with earth at a minimum depth of 0.5m (20 inches) and at least 1m (3 feet) from the foundation, this ring incorporates ground rods at strategic intervals and serves as the primary electrode system.
Read article
Expertise vs. Experience: What Truly Sets E&S Grounding Apart
At E&S Grounding Solutions, our 22+ years in business represent more than just longevity. They represent the expertise we've cultivated through tackling some of the most challenging engineering problems in grounding, earthing, and electrical safety. Our experience spans a broad range of industries and applications, including step and touch voltage assessments at substations, electromagnetic interference analyses for data centers, and specialized lightning risk assessments.
Read article